STATEMENT OF METHODOLOGY FOR INSTALLATION OF PERFORATED PIPE

TITLE: STATEMENT OF METHODOLOGY FOR INSTALLATION OF PERFORATED PIPE PURPOSE: The puprpose of this methodology is to illustrate the guidelines and procedures on the installation of Perforated Pipeping and underdrain works. SCOPE: The work procedure shall apply to Plumbing System for the Construction of all permanent and major temporary works. PROCEDURES: A. PRE-INSTALLATION 1. Secure the approved plans and drawings to be used for the activity 2. Verify if the area is ready for the activity 3. prepare all the  materials needed based on the approved material submittals. Materials should be checked and inspected upon delivery prior to installation. 4. Prepare all the required manpower, tools and equipments, and PPE for the installation. 5. Secure all the required work permits and safety permits prior to exevution of activities. B. INSTALLATION PROCEDURE: 1. Drill holes in the PVC Pipe. The hole diameter shall be 13mm with spacing of 150mm staggered or as recommended by the designers an...

Statement of Methodology for Pipe Sleeving

TITLE: METHOD STATEMENT FOR  SLEEVING WORK 1.Purpose ● The Purpose of this method statement is to detail the procedure of sleeving works. Ensure that proper installation procedure shall be implemented in accordance with existing general provisions. 2. Scope of Work ● The work under this section includes providing all manpower, tools and equipment’s for jointing installation of sleeves. 3. Procedure ● Make sure that all  tools and PPE’s are complete. ● Secure work permits before proceeding to the required work. ● Prepare all the following tools needed for the installation of sleeves. - Plum bob - Measuring tape - Level bar - Adjustable Wrench - A-type Ladder ● The length of pipe sleeve shall be the sa...

Statement of Methodology for the Installation of PPR Pipes for Waterline

     TITLE: METHOD STATEMENT FOR THE INSTALLATION OF PPR PIPES FOR WATER LINE 1.PURPOSE ● The Purpose of this method statement is to detail the procedure of Jointing of PPR-PN20 Pipes and Fittings for Potable and Non-Potable Water line. Ensure that proper installation procedure shall be implemented in accordance with existing general provisions. 2. SCOPE OF WORK ● The work under this section includes providing all manpower, tools and equipment’s for jointing PPR Pipes and fittings. 3. PROCEDURE ● Secure work permits before proceeding to the required work.            ● Make sure that PPE's are complete. ● Prepare the following tools and equipments: - Pipe Cutter - Meter Tape - Fusion Machine - Extension Cord - Socket Welder - Clean Cloth - Pencil / Marker ...

Statement of Methodology for Gravity Leak Test (NON PRESSURIZED PIPING SYSTEM)

TITLE: GRAVITY LEAK TEST (NON PRESSURIZED PIPING SYSTEM) 1. Purpose       The purpose of this method statement is to detail the Hydrostatic Test for Non-Pressurized Piping System. Ensure that proper installation procedure shall be implemented in accordance with existing general provision 2. Scope of Work The work under this section includes providing all manpower, tools and equipments for hydrostatic testing.  3.    Procedure • Make sure that all tools and PPE’s are complete. • Secure work permits before proceeding to the required work. • Prepare all the following needed tools for testing. - Motorized Test Pump - Testing Manifold - Pipe Wrench - Calibrated Pressure Gauge (Refer to attached sticker) - Adjustable Wrench - Masking Tape - Drum and Hose • Prepare the necessary documents such as inspection and testing permits with specified key plan location attached as well as other pertinent document...

STATEMENT OF METHODOLOGY FOR CONSTRUCTION OF DRAINAGE SYSTEM

  TITLE: CONSTRUCTION OF DRAINAGE SYSTEM 1 SCOPE This method statement deals with surveys and layout, excavation, pipe laying, pipe collaring and backfilling of drainage system in the preparation of drainage box to complete the drainage line. 2 REFERENCE DOCUMENTS 2.1 Project Specification 2.2 Approved Plans 2.3 ITP – Inspection Test Plan 3 WORK PROCEDURE 3.1 Survey and Layout A. Preparation • Orientation of Workers or toolbox meeting before start of work. • Wear complete personal protective equipment always on the jobsite. • Secure work permit based on the scope of work to be executed. • Review plans for what and where the activity must be conducted. • Clear the area and install barricades before execution of the activity. • Ensure that all submittals are approved and signed. B. Execution • Ensure that the request for layout was submitted to survey group a day before the execution of activity. • Provide work activity permit prior to start the activity. ...

How to create Statement of Methodology?

Before we start, one must know that setting Work Methodologies is very important especially in a medium and large scale projects where your Client has their own established parameters prior to execution of work. They will require you to submit your Statement of Methodologies to complete the project before they allow you to mobilize. Thus, it will result to further delay of your project. Here, we are going to set a simple guidelines on what your Statement of Methodology must contain before you execute your activity: I. Title Indicate the specific title of the work activity II. Table of Contents This one is optional. You may include this section in your MS (Statement of Methodology) to make it presentable. Some General contractors are requiring their subcontractors to put Table of Contents in their submitted MS. III. Purpose Be specific in stating the purpose of your MS IV. Scope of work Briefly describe the content of your Statement of Methodology. V. Tools and Materials Specify all the...