TITLE: STATEMENT OF METHODOLOGY FOR INSTALLATION OF PERFORATED PIPE PURPOSE: The puprpose of this methodology is to illustrate the guidelines and procedures on the installation of Perforated Pipeping and underdrain works. SCOPE: The work procedure shall apply to Plumbing System for the Construction of all permanent and major temporary works. PROCEDURES: A. PRE-INSTALLATION 1. Secure the approved plans and drawings to be used for the activity 2. Verify if the area is ready for the activity 3. prepare all the materials needed based on the approved material submittals. Materials should be checked and inspected upon delivery prior to installation. 4. Prepare all the required manpower, tools and equipments, and PPE for the installation. 5. Secure all the required work permits and safety permits prior to exevution of activities. B. INSTALLATION PROCEDURE: 1. Drill holes in the PVC Pipe. The hole diameter shall be 13mm with spacing of 150mm staggered or as recommended by the designers and Co
TITLE: STATEMENT OF METHODOLOGY FOR INSTALLATION OF PERFORATED PIPE
PURPOSE:
The puprpose of this methodology is to illustrate the guidelines and procedures on the installation of Perforated Pipeping and underdrain works.
SCOPE:
The work procedure shall apply to Plumbing System for the Construction of all permanent and major temporary works.
PROCEDURES:
A. PRE-INSTALLATION
1. Secure the approved plans and drawings to be used for the activity
2. Verify if the area is ready for the activity
3. prepare all the materials needed based on the approved material submittals. Materials should be checked and inspected upon delivery prior to installation.
4. Prepare all the required manpower, tools and equipments, and PPE for the installation.
5. Secure all the required work permits and safety permits prior to exevution of activities.
B. INSTALLATION PROCEDURE:
1. Drill holes in the PVC Pipe. The hole diameter shall be 13mm with spacing of 150mm staggered or as recommended by the designers and Consultan.
2. Wrap the PVC Pipe with Filter Cloth.
3. Identify the location of area to be excavate based on approved plan and drawings.
4. Check the invert elevation. Use shovel of chipping gun for excavation of underdrain or perimeter drain.
5. Provide gravel bedding (20mm to 40mm) in the trench.
6. Wrap the Pipe with aggregates or gravel and also cover with Filter cloth for another layer.
7. Use nylon wire for tie of filter cloth
8. Maintain minimum slope of 0.5% for pipe installation.
9. Proceed to the flow testing of Perforated Pipe
10. Secure the gravel with wire mesh/plywood during backfill and concreting.
TOOLS AND EQUIPMENT
1. PVC Pipe Series 1000
2. Filter Cloth
3. Gravel
4. Nylon Wire
5. Hand drill
6. Chipping Gun
7. Shovel
Wow, this article is awesome wish to see more like this. Thanks for sharing such information. You can check this out too Burst Pipes Repair Western Australia. Thank you.
ReplyDeleteI always check this type of advisory post and I found your article which is related to my interest. Steel Pipe Fittings For Sale Online This is a great way to increase knowledge for us. Thanks for sharing an article like this.
ReplyDeleteI just need to say this is a well-informed article which you have shared here about hoodies. It is an engaging and gainful article for us. Continue imparting this sort of info, Thanks to you. Repipe Specialists San Antonio
ReplyDeleteI am amazed by the way you have explained things in this article. This article is quite interesting and I am looking forward to reading more of your posts. Thanks
ReplyDeleteHDPE Fittings