STATEMENT OF METHODOLOGY FOR INSTALLATION OF PERFORATED PIPE

TITLE: STATEMENT OF METHODOLOGY FOR INSTALLATION OF PERFORATED PIPE PURPOSE: The puprpose of this methodology is to illustrate the guidelines and procedures on the installation of Perforated Pipeping and underdrain works. SCOPE: The work procedure shall apply to Plumbing System for the Construction of all permanent and major temporary works. PROCEDURES: A. PRE-INSTALLATION 1. Secure the approved plans and drawings to be used for the activity 2. Verify if the area is ready for the activity 3. prepare all the  materials needed based on the approved material submittals. Materials should be checked and inspected upon delivery prior to installation. 4. Prepare all the required manpower, tools and equipments, and PPE for the installation. 5. Secure all the required work permits and safety permits prior to exevution of activities. B. INSTALLATION PROCEDURE: 1. Drill holes in the PVC Pipe. The hole diameter shall be 13mm with spacing of 150mm staggered or as recommended by the designers and Co

STATEMENT OF METHODOLOGY FOR INSTALLATION OF PERFORATED PIPE

TITLE: STATEMENT OF METHODOLOGY FOR INSTALLATION OF PERFORATED PIPE

PURPOSE:
The puprpose of this methodology is to illustrate the guidelines and procedures on the installation of Perforated Pipeping and underdrain works.

SCOPE:
The work procedure shall apply to Plumbing System for the Construction of all permanent and major temporary works.

PROCEDURES:
A. PRE-INSTALLATION
1. Secure the approved plans and drawings to be used for the activity
2. Verify if the area is ready for the activity
3. prepare all the  materials needed based on the approved material submittals. Materials should be checked and inspected upon delivery prior to installation.
4. Prepare all the required manpower, tools and equipments, and PPE for the installation.
5. Secure all the required work permits and safety permits prior to exevution of activities.

B. INSTALLATION PROCEDURE:
1. Drill holes in the PVC Pipe. The hole diameter shall be 13mm with spacing of 150mm staggered or as recommended by the designers and Consultan.
2. Wrap the PVC Pipe with Filter Cloth.
3. Identify the location of area to be excavate based on approved plan and drawings.
4. Check the invert elevation. Use shovel of chipping gun for excavation of underdrain or perimeter drain.
5. Provide gravel bedding (20mm to 40mm) in the trench.
6. Wrap the Pipe with aggregates or gravel and also cover with Filter cloth for another layer.
7. Use nylon wire for tie of filter cloth
8. Maintain minimum slope of 0.5% for pipe installation.
9. Proceed to the flow testing of Perforated Pipe
10. Secure the gravel with wire mesh/plywood during backfill and concreting.

TOOLS AND EQUIPMENT
1. PVC Pipe Series 1000
2. Filter Cloth
3. Gravel
4. Nylon Wire
5. Hand drill
6. Chipping Gun
7. Shovel


 

Comments

  1. Wow, this article is awesome wish to see more like this. Thanks for sharing such information. You can check this out too Burst Pipes Repair Western Australia. Thank you.

    ReplyDelete
  2. I always check this type of advisory post and I found your article which is related to my interest. Steel Pipe Fittings For Sale Online This is a great way to increase knowledge for us. Thanks for sharing an article like this.

    ReplyDelete
  3. I just need to say this is a well-informed article which you have shared here about hoodies. It is an engaging and gainful article for us. Continue imparting this sort of info, Thanks to you. Repipe Specialists San Antonio

    ReplyDelete
  4. I am amazed by the way you have explained things in this article. This article is quite interesting and I am looking forward to reading more of your posts. Thanks

    HDPE Fittings

    ReplyDelete

Post a Comment

Popular posts from this blog

Statement of Methodology for Gravity Leak Test (NON PRESSURIZED PIPING SYSTEM)

TITLE: GRAVITY LEAK TEST (NON PRESSURIZED PIPING SYSTEM) 1. Purpose       The purpose of this method statement is to detail the Hydrostatic Test for Non-Pressurized Piping System. Ensure that proper installation procedure shall be implemented in accordance with existing general provision 2. Scope of Work The work under this section includes providing all manpower, tools and equipments for hydrostatic testing.  3.    Procedure • Make sure that all tools and PPE’s are complete. • Secure work permits before proceeding to the required work. • Prepare all the following needed tools for testing. - Motorized Test Pump - Testing Manifold - Pipe Wrench - Calibrated Pressure Gauge (Refer to attached sticker) - Adjustable Wrench - Masking Tape - Drum and Hose • Prepare the necessary documents such as inspection and testing permits with specified key plan location attached as well as other pertinent documents needed. • Check all conne

STATEMENT OF METHODOLOGY FOR CONSTRUCTION OF DRAINAGE SYSTEM

  TITLE: CONSTRUCTION OF DRAINAGE SYSTEM 1 SCOPE This method statement deals with surveys and layout, excavation, pipe laying, pipe collaring and backfilling of drainage system in the preparation of drainage box to complete the drainage line. 2 REFERENCE DOCUMENTS 2.1 Project Specification 2.2 Approved Plans 2.3 ITP – Inspection Test Plan 3 WORK PROCEDURE 3.1 Survey and Layout A. Preparation • Orientation of Workers or toolbox meeting before start of work. • Wear complete personal protective equipment always on the jobsite. • Secure work permit based on the scope of work to be executed. • Review plans for what and where the activity must be conducted. • Clear the area and install barricades before execution of the activity. • Ensure that all submittals are approved and signed. B. Execution • Ensure that the request for layout was submitted to survey group a day before the execution of activity. • Provide work activity permit prior to start the activity. •

Statement of Methodology for Pipe Sleeving

TITLE: METHOD STATEMENT FOR  SLEEVING WORK 1.Purpose ● The Purpose of this method statement is to detail the procedure of sleeving works. Ensure that proper installation procedure shall be implemented in accordance with existing general provisions. 2. Scope of Work ● The work under this section includes providing all manpower, tools and equipment’s for jointing installation of sleeves. 3. Procedure ● Make sure that all  tools and PPE’s are complete. ● Secure work permits before proceeding to the required work. ● Prepare all the following tools needed for the installation of sleeves. - Plum bob - Measuring tape - Level bar - Adjustable Wrench - A-type Ladder ● The length of pipe sleeve shall be the same as to the t